Monday, 4 January 2016

Audience feedback

I showed both the digipak and the magazine advert to two members of staff and five pupils. The response was universally positive. In particular they commented on:

  • The bright colour tones which were consistent with the atmosphere of the song.
  • The composition within individual picture frames.
  • The 'fun nature of the pictures which corresponded with the fun nature of the song'.
  • The fact that the digipak contained track listings and other relevant information such as bling records company and the bar code.
  • The fact that the magazine cover presented and idealised picture of the band which would appeal to a young female audience who would want to be like these idealised figures.

The audience feedback was so positive that we did not need to make any additional changes.

Saturday, 2 January 2016

Constructing the Magazine Advert

When we was doing our Magazine advert on Photoshop, we chose a picture of our band and added our group name, name of the song, our song rating and websites where our song will be shared on. We used different layers for the little icons within the image. Photoshop helped us merge everything together and get a final magazine advert.

Friday, 1 January 2016

Constructing the Digipak


We also did our Digipak on Photoshop which included us editing 6 different pictures and then we added them on a Digipak template and merged them all together. Inside the pictures there are the name of our group, name of our album, songs in the album, label name, barcode and copyright. Photoshop helped us edit all the labels and merge them all together to make a final picture.

Saturday, 5 December 2015

The sun goes down - rough cut

We imported a rough cut of the Music Video on Youtube to show to a few teachers and students around the school. This helped us as many people gave their feedback on what we needed to improve and what was done perfectly. Also this let our audience know what type of music we was doing and how well we are at making suitable videos with the music we chose.






Friday, 4 December 2015

Second day of editing

On my second day of filming I had to add the band scene footage to Premier Pro and edit them to the rest of the footage on the timeline. It took me a while to fit it all in the 3 minute song and use footage that would attract viewers to watch it again and that is not repetitive. At the end f the day it all went smoothly and I finished the Music Video and it has been liked by whoever has seen it.



Thursday, 3 December 2015

First day of editing

On the first day of filming I added the song onto Premier Pro where we edited the video. I then added all the footage that we had recorded and started putting it together and matching the lip syncing with the song. I had to cut a lot of footage and use dissolve and other effects to make the video look as good as other Music Videos. 





Wednesday, 2 December 2015

Second day of filming

On our second day of filming we did the band scene where my group played the instruments and I lip synced the song. On this day we had to set up all the equipment and record within the time that the room was booked. We also used lighting to make the band scene look more original and interesting for the viewers.


Tuesday, 1 December 2015

First day of filming

On our first day of filming we set up the camera in Central London and started filming footage of me and the girls walking around and doing funny things. We went to different places to get different shots and views that we had planned for it to fit with our music video. We captured different shots that we was taught throughout our two year course of media and we had to match them to our music video theme.




Sunday, 11 October 2015

Risk Assessment

Risk Assessment
Group Members: Arsena, Naomi and Tanya Location: Train Station

Hazard
Person(s) at Risk
Likelihood of Hazard
1 – Extremely Unlikely
5 – Extremely Likely
Severity of Hazard Outcomes
1 – Very Low Risk
5 – Very High Risk
Risk Level
(Likelihood + Severity)
2
Measures to Take to Manage Risk
Risk Managed?
Y/N
Hit by a trainActors15Not likely very severe Make sure no one is near the trains or train tracks during filming or before filming.Yes
Trip over the platformEveryone24Likely
Severe 
To stand behind the yellow line on the platform Yes
Fall down the escalator Everyone32Not too likely to happen
Not too severe 
To look carefully before walking with the equipment Yes
Running at the station Everyone53Likely
Quite severe 
Make sure to take time when in the station. Especially when it is crowded because you could fall and break something or hurt yourselfYes

Saturday, 10 October 2015

Animatic



We chose to use a video to explain out animatic shots. On the video we include what the shot is about, where is it shot and how it is actually shot.

Friday, 9 October 2015

Story Board

1. Train
- wide/mid shot of train going past
-show tanya and arsena going inside train                 

2. Inside Train
-pov angle, mid shot
-tanya and arsena talking

3. Picadilly Circus
-wide shot
-pan sideways 
-establishing shot

4.Chinatown
-pov angel
-wide/mid shot
-tracking shot
-high angle
-arsena, tanya and naomi walking

5.Kpop/Anime store
-pov angle
-mid shot
-tracking shot
-long shot

6.Five Guys
-pov angle
-tanya, arsena and naomi eating
-mid shot

7. (near) Trafalgar Square (statue people)
- pov angle
-wide shot

8. M&M World
-pov angle
-mid shot
-high angle
-close up
-pan

9. Sunset
-time lapse
-wide shot